光大彩票官网入口

  • <tr id='8H6Uiu'><strong id='8H6Uiu'></strong><small id='8H6Uiu'></small><button id='8H6Uiu'></button><li id='8H6Uiu'><noscript id='8H6Uiu'><big id='8H6Uiu'></big><dt id='8H6Uiu'></dt></noscript></li></tr><ol id='8H6Uiu'><option id='8H6Uiu'><table id='8H6Uiu'><blockquote id='8H6Uiu'><tbody id='8H6Uiu'></tbody></blockquote></table></option></ol><u id='8H6Uiu'></u><kbd id='8H6Uiu'><kbd id='8H6Uiu'></kbd></kbd>

    <code id='8H6Uiu'><strong id='8H6Uiu'></strong></code>

    <fieldset id='8H6Uiu'></fieldset>
          <span id='8H6Uiu'></span>

              <ins id='8H6Uiu'></ins>
              <acronym id='8H6Uiu'><em id='8H6Uiu'></em><td id='8H6Uiu'><div id='8H6Uiu'></div></td></acronym><address id='8H6Uiu'><big id='8H6Uiu'><big id='8H6Uiu'></big><legend id='8H6Uiu'></legend></big></address>

              <i id='8H6Uiu'><div id='8H6Uiu'><ins id='8H6Uiu'></ins></div></i>
              <i id='8H6Uiu'></i>
            1. <dl id='8H6Uiu'></dl>
              1. <blockquote id='8H6Uiu'><q id='8H6Uiu'><noscript id='8H6Uiu'></noscript><dt id='8H6Uiu'></dt></q></blockquote><noframes id='8H6Uiu'><i id='8H6Uiu'></i>

                reclamation and greening

                Reclamation and Greening Project

                Reclamation and greening projects, mine tailings greening, ecological environment management, protection of soil, water sources, environment, and ecology, and deep implementation of the concept of "green water and green mountains are golden mountains and silver mountains".

                Construction technique

                Reclamation and Greening Project

                Reclamation and Greening Project

                Reclamation and greening projects, mine tailings greening, ecological environment management, protection of soil, water sources, environment, and ecology, and deep implementation of the concept of "green water and green mountains are golden mountains and silver mountains".

                View details

                Reclamation and Greening Project

                Reclamation and Greening Project

                Reclamation and greening projects, mine tailings greening, ecological environment management, protection of soil, water sources, environment, and ecology, and deep implementation of the concept of "green water and green mountains are golden mountains and silver mountains".

                View details

                Water mixing pile technology

                Water mixing pile technology

                The underwater deep mixing pile construction method, mixing pile engineering ship, underwater soil cutting and mixing, accurate injection of cement slurry, exchange of high and low slurry nozzles, environmental protection treatment system, intelligent control construction and other technologies are integrated, mastering the intelligent construction core technology of engineering ship mobile GPS positioning system, leveling system, cement slurry mixing and grouting system, drilling and lifting pile system, and other intelligent construction systems. It is a pioneer in domestic technology.

                View details

                Water PVD technology

                Water PVD technology

                The water PVD (plastic drainage board) engineering ship has two PVD (plastic drainage board) engineering ships, which use a shallow draft flat boat and a gantry type amphibious insertion machine for insertion. It adopts advanced GPS positioning and can meet the requirements of engineering design for insertion depth and spacing. The hard soil layer has strong penetration force and construction efficiency. The cumulative construction of water PVD (plastic drainage board) has reached 35 million meters, which can meet the requirements of offshore construction and strong anti surge It has stability, safety, and sustainability.

                View details

                Water based vibroflotation technology

                Water based vibroflotation technology

                The above water vibroflotation technology and the vibroflotation process for filling materials meet the quality requirements of construction pile position, verticality, and other parameters. The vibroflotation device is accurately positioned underwater and synchronized with multiple vibroflotation devices to ensure balanced stress on both sides of the pipeline during the vibroflotation process, ensuring quality assurance, significantly reducing cost and shortening construction period.

                View details

                Core competitiveness

                Mastering multiple research and development technologies in one

                Integrating multiple research and development technologies such as environmental protection treatment systems and intelligent control construction, mastering intelligent core construction technologies and breaking foreign monopolies in this field.

                International Construction Technology Innovators

                The strong hydraulic intelligent PVD on water has strong penetration into hard soil layers, and compared to its domestic counterparts, it is more efficient in construction, breaking domestic technical barriers, and has been widely praised by the industry.

                Own construction equipment

                Owning 4 DCM engineering ships
                15 onshore DCM pile drivers
                3 PVD engineering ships

                Projects