快三彩票最

  • <tr id='U5yzl0'><strong id='U5yzl0'></strong><small id='U5yzl0'></small><button id='U5yzl0'></button><li id='U5yzl0'><noscript id='U5yzl0'><big id='U5yzl0'></big><dt id='U5yzl0'></dt></noscript></li></tr><ol id='U5yzl0'><option id='U5yzl0'><table id='U5yzl0'><blockquote id='U5yzl0'><tbody id='U5yzl0'></tbody></blockquote></table></option></ol><u id='U5yzl0'></u><kbd id='U5yzl0'><kbd id='U5yzl0'></kbd></kbd>

    <code id='U5yzl0'><strong id='U5yzl0'></strong></code>

    <fieldset id='U5yzl0'></fieldset>
          <span id='U5yzl0'></span>

              <ins id='U5yzl0'></ins>
              <acronym id='U5yzl0'><em id='U5yzl0'></em><td id='U5yzl0'><div id='U5yzl0'></div></td></acronym><address id='U5yzl0'><big id='U5yzl0'><big id='U5yzl0'></big><legend id='U5yzl0'></legend></big></address>

              <i id='U5yzl0'><div id='U5yzl0'><ins id='U5yzl0'></ins></div></i>
              <i id='U5yzl0'></i>
            1. <dl id='U5yzl0'></dl>
              1. <blockquote id='U5yzl0'><q id='U5yzl0'><noscript id='U5yzl0'></noscript><dt id='U5yzl0'></dt></q></blockquote><noframes id='U5yzl0'><i id='U5yzl0'></i>

                Foundation treatment

                Zhuhai Port Gaolan Port Area Nanshui Operation Area Spoil Shore Wall Phase I Section 1 Project

                Release time:Jul 24,2023
                Number of views:
                Share:
                Zhuhai Port Gaolan Port Area Nanshui Operation Area Spoil Shore Wall Phase I Section 1 Project

                Zhuhai Port Gaolan Port Area Nanshui Operation Area Spoil Shore Wall Phase I Section 1 Project


                The first section of the first phase of the spoil bank wall project in the Nanshui operation area of the Gaolan Port Area of Zhuhai Port, with a construction period of 480 days, is located in the Gaolan Port Economic Zone of Zhuhai City. The project has a designed annual throughput of 16 million tons, and after completion, the dock coastline will be 668 meters long with a storage area of 300000 square meters. It will become a specialized dry bulk wharf in the Pearl River Delta region. The total investment in the spoil bank wall project in the Nanshui operation area of the Gaolan Port Area is 2.69 billion yuan, of which the first phase investment is 900 million yuan, After completion, a shoreline resource of 8000 meters will be formed.