彩神8ⅤI

  • <tr id='cKLUMz'><strong id='cKLUMz'></strong><small id='cKLUMz'></small><button id='cKLUMz'></button><li id='cKLUMz'><noscript id='cKLUMz'><big id='cKLUMz'></big><dt id='cKLUMz'></dt></noscript></li></tr><ol id='cKLUMz'><option id='cKLUMz'><table id='cKLUMz'><blockquote id='cKLUMz'><tbody id='cKLUMz'></tbody></blockquote></table></option></ol><u id='cKLUMz'></u><kbd id='cKLUMz'><kbd id='cKLUMz'></kbd></kbd>

    <code id='cKLUMz'><strong id='cKLUMz'></strong></code>

    <fieldset id='cKLUMz'></fieldset>
          <span id='cKLUMz'></span>

              <ins id='cKLUMz'></ins>
              <acronym id='cKLUMz'><em id='cKLUMz'></em><td id='cKLUMz'><div id='cKLUMz'></div></td></acronym><address id='cKLUMz'><big id='cKLUMz'><big id='cKLUMz'></big><legend id='cKLUMz'></legend></big></address>

              <i id='cKLUMz'><div id='cKLUMz'><ins id='cKLUMz'></ins></div></i>
              <i id='cKLUMz'></i>
            1. <dl id='cKLUMz'></dl>
              1. <blockquote id='cKLUMz'><q id='cKLUMz'><noscript id='cKLUMz'></noscript><dt id='cKLUMz'></dt></q></blockquote><noframes id='cKLUMz'><i id='cKLUMz'></i>

                Foundation treatment

                Soft Foundation Treatment Engineering of Yishang Jiaxing Haining Intelligent Manufacturing Industrial Park Project

                Release time:Apr 20,2023
                Number of views:
                Share:
                Soft Foundation Treatment Engineering of Yishang Jiaxing Haining Intelligent Manufacturing Industrial Park Project
                 
                易商嘉兴海宁智能制造产业园项目软基处理工程

                 
                Project Name: Soft Foundation Treatment Engineering of Yishang Jiaxing Haining Intelligent Manufacturing Industrial Park Project
                Construction content: To solve the problem of post construction settlement of muddy soil layers, plastic drainage boards combined with vacuum preloading drainage consolidation method are used to reinforce the soft foundation of the site
                Project scale: The total land area of the project is 85371 square meters, with a total construction area of 103006 square meters and a construction area of approximately 103006 square meters.
                 
                detailed information

                The foundation treatment engineering of the Yishang Jiaxing Haining Intelligent Manufacturing Industrial Park project is proposed to be located on the east side of Haining Avenue in Haining City. The south side is the Jiaxing Haining Anzheng Fashion Group Cultural Industrial Park, and the north and east sides are both rivers. The total land area of the project is 85371 square meters, with a total construction area of 103006 square meters. Two two-story factories and related ancillary facilities are proposed, with a construction area of approximately 103006 square meters.

                Design scheme for soft foundation treatment

                After the design and demonstration by the Sunzo team, a soft foundation treatment plan has been determined, and the project needs to solve the problem of post construction settlement of the muddy soil layer; The bearing capacity of foundation soil. The overall plan adopts plastic drainage boards combined with vacuum preloading drainage consolidation method to treat the soft foundation of the site; Among them, the vacuum preloading method adopts the "non drainage sand cushion vacuum preloading method" (Sunzo invention patent), which has low cost, short construction period, and environmental protection and low consumption.
                 
                真空预压全面恒载软基处理
                 
                Vacuum preloading for comprehensive dead load soft foundation treatment
                Construction work content
                The foundation treatment engineering project of Yishang Jiaxing Haining Intelligent Manufacturing Industrial Park entered the construction site on December 1, 2019, and entered the dead load state through vacuum preloading on February 13, 2020. Vertical drainage channel - construction of plastic drainage boards, construction of horizontal drainage systems - laying of pipelines (installing corrugated pipes and plate pipe connectors), construction of sealing walls, filling of cofferdams, vacuum preloading for full dead load. The project was completed and delivered for acceptance on May 20, 2020, with an estimated duration of 172 days.